Saturday & Sunday I got the new server prepped. Basically reinstalled & reconfigured as per the tech recipe that I've been sorting out over the last few months.
Another few things to do today, then will be moving GC over to the new server, doing another software upgrade, then re-opening the site. That should be before the day is over.
By the way, I don't want to disappoint anyone who may have missed where I posted about it not being a visual upgrade. When GC is back online it will look the same (with this project) but should be running a lot better. Background software & hardware is what will be changing this time around.
__________________
John Hammell
Network Admin, GreekChat.com
|