They just finished what was supposed to be a seven year project widening I-25 (the Valley Highway) from the Denver Tech Center to Downtown. They did a really good job, I think. The contract called for at least three lanes to be open each way most of the day (there were a few overnights -- like midnight to 5:00 AM when it was down to two lanes -- and a couple of short distance total closures overnight) and replaced ALL of the bridges going over the highway along with most of the on and off ramps. They also added Light Rail the entire length of the project. It was called T-Rex which might give some idea of what was expected.
They managed to finish it more than a year early, and under budget.
It's not that there weren't hassles, nor was the job without problems, but given how screwed up it could have made things, I was pretty impressed.
I think this was the same company that re-built a lot of the freeways in Salt Lake City prior to the Olympics, which I hear was a headache of gigantic proportions.
They must have learned from their mistakes.
__________________
Fraternally,
DeltAlum
DTD
The above is the opinion of the poster which may or may not be based in known facts and does not necessarily reflect the views of Delta Tau Delta or Greek Chat -- but it might.
Last edited by DeltAlum; 08-05-2007 at 04:00 PM.
|